Fire Protection Projects
Featured Project
Promega R&D | Fitchburg, WI
Scope: Fire Protection
Category: New Construction
Description: 270,000 sq ft lab and office building.
Fire Protection Project Gallery
The McKenzie Family Boys and Girls Club | Sun Prairie, WI
Scope: Plumbing and Fire Protection
Category: Retrofit
Description: Renovation of an existing church building.
Saint Gobain
Scope: Plumbing, Fire Protection
Category: New Construction, Additions
Description: Monona Plumbing and Fire Protection handled both Fire Protection and Plumbing system work at the Saint-Gobain Portage plant expansion. We completed a complete sprinkler system installation for the warehouse, consisting of over 700 sprinkler heads. Installation of a complete underground sanitary system, storm & clear water system, and fixtures throughout the site were handled by our Plumbing team.
Badger Prairie Needs Network
Scope: Fire Protection
Category: Retrofit
Description: After several years of searching for a new home, Badger Prairie Needs Network moved into a county-owned building that had been vacant for several years. The 7,000 square foot building required remodel work to the building in order to accommodate BPNN\’s needs. Monona Plumbing and Fire Protection completed all of the Fire Protection work on this project.
Festival Foods
Scope: Fire Protection
Category: New Construction
Description: The Festival Foods project included unique architecture that we worked around with our fire protection installation. Locally grown trees were culled to prevent the spread of the Emerald Ash Borer then treated to be used as structural support. Festival Foods connects directly to The Galaxie apartment complex and contains both wet and dry fire protection systems.
Nichols Station
Scope: Fire Protection, Plumbing
Category: Retrofit
Description: Nichols Station is a designated Historical Landmark in Madison, WI. Built in 1917, it played an important part in the advancement of water works technology in Wisconsin\’s capital city, pumping 8 million gallons of water a day to the city. In 2015, the historical building underwent a comprehensive renovation project that transformed all 34 apartment units within the building, all while keeping the historic features of the building preserved. Monona Plumbing and Fire Protection handled the Fire Protection and Plumbing needs for this extensive renovation.
Tower Rock Elementary
Scope: Site Utilities, Fire Protection, Plumbing
Category: New Construction, Education
Description: Monona Plumbing and Fire Protection performed Site Utilities, Fire Protection, and Plumbing work on this new addition to an existing school. Due to the rural location of the school, adequate water supply was not available. Two water tanks were added underground to supply a vertical turban pump to provide water to the system.
Wisconsin Brewing Company
Scope:Fire Protection, Plumbing
Category: New Construction, Specialty Piping
Description: Wisconsin Brewing Company is one of Wisconsin\’s newest breweries and has the capacity to make up to 100,000 barrels per year. The taproom can hold several hundred visitors at a time and includes large windows where visitors can see into the brew room at all times. Monona Plumbing and Fire Protection handled both Fire Protection and Plumbing on this large project. This 20,000 sq ft facility opened to the public in Fall of 2013.
Camp Randall Student Athletic Performance Center
Scope:Plumbing, Fire Protection, Site Utilities
Category: Retrofit
Description: Monona Plumbing and Fire Protection was recognized in the \”Specialty Contractor- Plumbing\” category for our work on the Camp Randall Student Athletic Performance Center with the AGC 2013 Build Wisconsin Award. This first phase of the renovation project to Camp Randall led to the completion of the private tunnel that connects the stadium field to the locker rooms, training facilities and offices. As an integral partner on this project Monona Plumbing and Fire Protection was responsible for the site utilities within the tunnel as well as the plumbing and fire protection on the north end zone remodel. The project was on a tight time table to get things ready for the fall football season and home games. – Camp Randall is the oldest stadium in the Big Ten Conference, and was ready for some much needed upgrades to their current facilities. Camp Randall was originally opened as a fully functioning stadium in 1917 and has since undergone several expansions and renovation projects since that time and today seats over 80,000 fans.