University of Wisconsin Biochemistry Laboratory Project
433 Babcock Drive
Madison, WI 53706
This was a $187,874.00 budgeted project on a 200,000 square foot building.
Monona Plumbing & Fire Protection provided the addition of an air compressor and nitrogen compressor capabilities. The nitrogen compressor included an air dryer. We also provided the addition of their sump pump system with piping and the hooking up of all parts.
Richland Heights Project
Richland Heights subdivision in Monroe.
We recently started this project.
- 47-acre site
- 50 2-4 bedroom single-family homes
We are in the process of installing:
- 6,220’ of gravity sanitary sewer
- 2,200’ of sanitary force main
- 24 sanitary sewer manholes
- 3,800’ of water distribution piping
Allen Bay Apartments Project
The Allen Bay Apartment Complex will comprise two 3-story apartment buildings, with each building holding 31 residential units.
Square Footage: 101, 960
Our crew installed a sanitary sewer main installation. An anti-float collar was poured from a fiberglass lift station at a depth of 17 feet, with a dewater system and a force main tie-in.